72-16 (bizhub C554/C454)
Please search Knowledge Base articles and Bulletins as they may contain relevant information and updated Part information such as Part numbers.
Contents
JAM type | FS transport section | ||
JAM code | 72-16 | ||
Detection timing | <When FS-533 is installed> The paper feed sensor (PS101) is not turned ON even after the set period of time has elapsed after the main bodyĆ¢??s paper exit sensor (PS3) is unblocked by the paper. | ||
<When FS-533+PK-519 is installed> The paper feed sensor (PS101) is not turned ON even after the set period of time has elapsed after the paper feed sensor (PS201) is turned ON by the paper. | |||
<When FS-534 is installed> The FNS entrance sensor (PS4) is not turned ON even after the set period of time has elapsed after the RU entrance sensor (PS2) is blocked by the paper. | |||
<When FS-535 is installed> The FNS entrance sensor (PS1) is not turned ON even after the set period of time has elapsed after the RU transport sensor (PS60) is blocked by the paper. | |||
Misfeed processing location | -Finisher paper feed section <When FS-533 is installed> -Horizontal conveyance cover <When FS-534 or FS-535 is installed> | ||
Relevant parts | <When FS-533 is installed> -Paper conveyance motor (M101) -Paper exit sensor (PS3) -Paper feed sensor (PS101) -FS control board (FSCB) -Printer control board (PRCB) | ||
<When FS-533+PK-519 is installed> -Paper conveyance motor (M101) -Paper feed sensor (PS101) -Paper feed sensor (PS201) -FS control board (FSCB) -Printer control board (PRCB) | |||
<When FS-534 is installed> -RU entrance sensor (PS2) -FNS entrance sensor (PS4) -FS control board (FSCB) | |||
<When FS-535 is installed> -RU transport sensor (PS60) -FNS entrance sensor (PS1) -FS control board (FSCB) |
(2)Procedure When FS-533 or FS-533+PK-519 is installed
Step | Action | Control signal | Location of electrical component |
1 | Initial check items | – | – |
2 | PS3 I/O check, sensor check | PRCB CN21-7 (ON) | bizhub C554/C454 15-C |
3 | PS101 I/O check, sensor check | FSCB CN111 | FS-533 7-D to E |
4 | PS201 I/O check, sensor check | PKCB CN204 | FS-533 (PK-519) 5-C |
5 | M101 operation check | FSCB CN101 | FS-533 6-J |
6 | FSCB CP101 conduction check | – | – |
7 | Replace FSCB (Part# A2YUPPH901(Model No. A2YU-WY1) or A2YUPPXN00 (Model No. A2YU-WY2)) | – | – |
8 | Replace PRCB (C554 Part# A2XKH00104 / C454 Part# A4FJH00104) | – | – |
- Link to the wiring diagram (N.1. bizhub C554/C454)
- Link to the wiring diagram (N.3.7 FS-533)
When FS-534 is installed
Step | Action | Control signal | Location of electrical component |
1 | Initial check items | – | – |
2 | PS2 I/O check, sensor check | FSCB J6-7 (ON) | FS-534 6-K |
3 | PS4 I/O check, sensor check | FSCB J7-13 (ON) | FS-534 8-K |
4 | Replace FSCB (Part# A3EPPPBE01) | – | – |
- Link to the wiring diagram (N.3.8 FS-534)
When FS-535 is installed
Step | Action | Control signal | Location of electrical component |
1 | Initial check items | – | – |
2 | PS60 I/O check, sensor check | RUCB CN206-3 (ON) | FS-535 3-P to Q |
3 | PS1 I/O check, sensor check | FSCB CN2-8 (ON) | FS-535 1-J to K |
4 | Replace FSCB (Part# A2Y1H10002) | – | – |
- Link to the wiring diagram (N.3.10 FS-535)
K1.10.5 (Link to the Field Service Manual)