72-16 (bizhub C554e/C454e)
Contents
JAM type | FS transport section | ||
JAM code | 72-16 | ||
Detection timing | <When FS-533 is installed> The paper feed sensor (PS101) is not turned ON even after the set period of time has elapsed after the main body’s paper exit sensor (PS3) is unblocked by the paper. | ||
<When FS-533+PK-519 is installed> The paper feed sensor (PS101) is not turned ON even after the set period of time has elapsed after the paper feed sensor (PS201) is turned ON by the paper. | |||
<When FS-534 is installed> The FNS entrance sensor (PS4) is not turned ON even after the set period of time has elapsed after the RU entrance sensor (PS2) is blocked by the paper. | |||
<When FS-535 is installed> The FNS entrance sensor (PS1) is not turned ON even after the set period of time has elapsed after the RU transport sensor (PS60) is blocked by the paper. | |||
Misfeed processing location | • Finisher paper feed section <When FS-533 is installed> • Horizontal conveyance cover <When FS-534 or FS-535 is installed> | ||
Relevant parts | <When FS-533 is installed> • Paper conveyance motor (M101) • Paper exit sensor (PS3) • Paper feed sensor (PS101) • FS control board (FSCB) • Printer control board (PRCB) | ||
<When FS-533+PK-519 is installed> • Paper conveyance motor (M101) • Paper feed sensor (PS101) • Paper feed sensor (PS201) • FS control board (FSCB) • Printer control board (PRCB) | |||
<When FS-534 is installed> • RU entrance sensor (PS2) • FNS entrance sensor (PS4) • FS control board (FSCB) | |||
<When FS-535 is installed> • RU transport sensor (PS60) • FNS entrance sensor (PS1) • FS control board (FSCB) |
(2)ProcedureWhen FS-533 or FS-533+PK-519 is installed
Step | Action | Control signal | Location of electrical component |
1 | Initial check items | – | – |
2 | PS3 I/O check, sensor check | PRCB CN21-7 (ON) | bizhub C554e/C454e 16-C |
3 | PS101 I/O check, sensor check | FSCB CN111 | FS-533 7-D to E |
4 | PS201 I/O check, sensor check | PKCB CN204 | FS-533 (PK-519) 5-C |
5 | M101 operation check | FSCB CN101 | FS-533 6-J |
6 | FSCB CP101 conduction check | – | – |
7 | Replace FSCB (Part# A2YUPPH901(Model No. A2YU-WY1) or A2YUPPXN00 (Model No. A2YU-WY2)) | – | – |
8 | Replace PRCB (C554e Part# A5AYH00101 / C454e Part# A5C0H00101) | – | – |
- Link to the wiring diagram (N.1. bizhub C554e/C454e)
- Link to the wiring diagram (N.3.7 FS-533)
When FS-534 is installed
Step | Action | Control signal | Location of electrical component |
1 | Initial check items | – | – |
2 | PS2 I/O check, sensor check | FSCB J6-7 (ON) | FS-534 6-K |
3 | PS4 I/O check, sensor check | FSCB J7-13 (ON) | FS-534 8-K |
4 | Replace FSCB (Part# A3EPPPBE01) | – | – |
- Link to the wiring diagram (N.3.8 FS-534)
When FS-535 is installed
Step | Action | Control signal | Location of electrical component |
1 | Initial check items | – | – |
2 | PS60 I/O check, sensor check | RUCB CN206-3 (ON) | FS-535 3-P to Q |
3 | PS1 I/O check, sensor check | FSCB CN2-8 (ON) | FS-535 1-J to K |
4 | Replace FSCB (Part# A2Y1H10002) | – | – |
- Link to the wiring diagram (N.3.10 FS-535)
Please search Knowledge Base articles and Bulletins as they may contain relevant information and updated Part information such as Part numbers.
K.1.10.6 (Link to the Field Service Manual)