How Can We Help?

C1197 (bizhub 750i)

You are here:

Please search Knowledge Base articles and Bulletins as they may contain relevant information and updated Part information such as Part numbers.

When FS-539SD is installed

Contents

Trouble typeC1197: Tri-folding guide motor malfunction (When FS-539SD is installed)
RankB
Trouble detection conditionThe tri-folding gate home sensor (PS111) is not turned OFF (blocked) or ON (unblocked) even after the set period of time has elapsed while the tri-folding guide motor (M108) is energized.
Trouble isolationCenter Stapling/Half-Fold/Tri-Fold
Relevant electrical parts-Tri-folding guide motor (M108)
-Tri-folding gate home sensor (PS111)
-SD control board (SDCB)
-FS control board (FSCB)

Procedure

  1. Check the connector between M108-SDCB J8 for proper connection and correct as necessary.
  2. Check the connector of M108 for proper drive coupling and correct as necessary.
  3. Check the connector between PS111-SDCB J8 for proper connection and correct as necessary.
  4. PS111 I/O check, sensor check
    • Control signal: SDCB J8-10 (ON)
    • Location of electrical component: FS-539/FS-539SD 3-P
  5. M108 operation check
    • Control signal: SDCB J8-11 to 14
    • Location of electrical component: FS-539/FS-539SD 3-P
  6. Replace M108. (Part# A3EPPP5600)
  7. Replace SDCB. (Part# A3ERPP6J03)
  8. Replace FSCB. (Part# AAR4PP8201)

 When FS-540SD is installed

Contents

Trouble typeC1197: Tri-folding guide motor malfunction (When FS-540SD is installed)
RankB
Trouble detection conditionThe tri-folding gate home sensor (PS111) is not turned OFF (blocked) or ON (unblocked) even after the set period of time has elapsed while the tri-folding guide motor (M108) is energized.
Trouble isolationCenter Stapling/Half-Fold/Tri-Fold
Relevant electrical parts-Tri-folding guide motor (M108)
-Tri-folding gate home sensor (PS111)
-SD control board (SDCB)
-FS control board (FSCB)

Procedure

  1. Check the connector between M108-SDCB J8 for proper connection and correct as necessary.
  2. Check the connector of M108 for proper drive coupling and correct as necessary.
  3. Check the connector between PS111-SDCB J8 for proper connection and correct as necessary.
  4. PS111 I/O check, sensor check
    • Control signal: SDCB J8-10 (ON)
    • Location of electrical component: FS-540/FS-540SD 3-P
  5. M108 operation check
    • Control signal: SDCB J8-11 to 14
    • Location of electrical component: FS-540/FS-540SD 3-P
  6. Replace M108. (Part# A3EPPP5600)
  7. Replace SDCB. (Part# A3ERPP6J03)
  8. Replace FSCB. (Part# AAR5PPD401)

(Link to the Field Service Manual)

Table of Contents