99-09 (bizhub C658/C558/C458)
Posted
ByAdministrator Administrator
Contents
JAM type | | Controller JAM (finisher not completing a job) |
JAM code | | 99-09 |
JAM detection timing | | A paper exit or paper finishing process inside the finisher is not completed.The finisher does not start during a reset procedure from the jam. | |
Misfeed processing location | | – |
Relevant parts | | – |
Procedure
Step | Action | Control signal | Location of electrical component |
---|
1 | Initial check items | – | – |
2 | Open and close the lower front door of the main body. Or, open and close the front door of the finisher. | – | – |
K.1.19.11 (Link to the Field Service Manual)